March 16 (LNGJ) - The 140,000 cubic metres capacity carrier “Arctic Voyager” is scheduled to deliver a cargo on March 19 to the Revithoussa import terminal in Greece from the Hammerfest plant in Norway operated by Statoil. The 155,000 cubic metres capacity vessel “Gaslog Sydney” is scheduled to unload a shipment on April 4 at the import terminal at Map Ta Phut in Thailand. The Thai cargo was lifted from the Equatorial Guinea plant on Bioko Island in West Africa, operated by Marathon Oil.








