Belgium and China LNG

Written by  John McKay
Friday, 17 March 2017
Free Read

March 17 (LNGJ) - The 145,000 cubic metres capacity vessel “Milaha Qatar” is scheduled to deliver a cargo on March 20 to the Belgian import terminal at Zeebrugge. The shipment was lifted at the Ras Laffan plant operated by Qatargas. The 174,000 cubic metres capacity “Maran Gas Pericles” was unloading a US shipment on March 17 at the Chinese Tianjin import facility, operated by China National Offshore Oil Corp. The cargo had been lifted on February 17 at the Sabine Pass plant in Louisiana, operated by Cheniere Energy.

 

Last modified on Friday, 17 March 2017 10:10
Rate this item
(0 votes)

Related Video

Free Read