Revithoussa LNG upgrade completed

Written by  Anja Karl
Monday, 19 May 2025
Free Read

Operations at the Revithoussa LNG regasification and import terminal in Greece have resumed after a planned shutdown to upgrade the plant with a new high-pressure BOG compressor. According to Greece’s National Gas System Operator (DESFA), the upgrade will eliminate the need for wasteful gas flaring during normal operations.

Rate this item
(0 votes)

Related Video

Free Read