Oct 10 (LNGJ) - The 266,000 cubic metres capacity Q-Max vessel “Al Bahiya” is scheduled to unload a cargo on October 13 at the UK Isle of Grain import terminal on the Medway River in Kent, 45 miles southeast of London, from the Ras Laffan plant in Qatar, according to shipping data. The shipment was being delivered as the UK National Balancing Point benchmark natural gas price was at the equivalent of $6.40 per million British thermal units, while one of the main continental European prices, the Dutch Title Transfer Facility (TTF), was lower at the equivalent of around $6.25 per MMBtu.








