Taiwan could seek more LNG cargoes as one of its nuclear power plants retired in mid-March, though the ministry of economic affairs underlined that two new coal-fired generators will more than offset the power loss. The 935 MW Guosheng Nuclear Power Plant’s reactor No. 2 will be replaced by two coal-fired units with a combined capacity of 1,300 MW.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||