Neal Prescott and Jeff Zhang, Fluor Offshore Solutions, Houston, Texas
At LNG terminals, the connection piping between the LNG tank and the loading arms can sometimes be of significant length, up to several miles, so that the loading/offloading jetty structure can be at sufficient water depth for tanker access.