×

Warning

JUser: :_load: Unable to load user with ID: 62

Fluor shows how to manage contraction and stress in LNG plant pipeline systems

Written by 
Friday, 30 October 2009 09:45
Neal Prescott and Jeff Zhang, Fluor Offshore Solutions, Houston, Texas

At LNG terminals, the connection piping between the LNG tank and the loading arms can sometimes be of significant length, up to several miles, so that the loading/offloading jetty structure can be at sufficient water depth for tanker access.
Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial