Nov 23 (LNGJ) - Two cargoes are heading for China to be unloaded for the December winter season demand surge. The 174,000 cubic metres capacity carrier “Gaslog Glasgow” is expected to deliver a cargo on December 4 to the Ningbo terminal in the eastern province of Zheijang, operated by China National Offshore Oil Corp., and lifted on November 5 from the US Sabine Pass plant. The 148,300 cubic metres capacity vessel “LNG Imo” is scheduled to deliver a Nigerian shipment on December 21 to the Tangshan import terminal in northern Hebei province, operated by PetroChina.








