Sept 22 (LNGJ) - The 141,000 cubic metres capacity carrier “LNG Cross River” is scheduled to unload a shipment on September 23 at the Huelva terminal in southwest Spain from the Bonny Island plant in Nigeria, according to shipping data. The 155,000 cubic metres capacity vessel “Gaslog Saratoga” is scheduled to deliver a cargo on September 25 to the French Montoir-de-Bretagne terminal near the Loire river estuary on the Atlantic coast from Ras Laffan in Qatar.








