Nov 9 (LNGJ) - The Indonesian Tangguh LNG plant Train II has been shut down after problems with a refrigerant unit. Tangguh produces 7.6 million tonnes per annum and it was recently decided a third production unit would be constructed by 2018.
Nov 9 (LNGJ) - The Indonesian Tangguh LNG plant Train II has been shut down after problems with a refrigerant unit. Tangguh produces 7.6 million tonnes per annum and it was recently decided a third production unit would be constructed by 2018.