GTT continues LNGC order success

Written by  Ian Cochran
Thursday, 02 October 2025
Free Read

French engineering Group, GTT has received an order from Hanwha Ocean for the tank design of a new LNGC, one of two 174,000 cu m vessels ordered by Hanwha Shipping at Philly Shipyard in the US.

As part of this order, GTT will design the vessel’s tanks, which will be fitted with the NO96 L03+ membrane containment system. Her delivery is scheduled for the first quarter of 2028.

This follows a recent order from Samsung Heavy Industries (SHI) for the tank design of two 180,000 cu m LNGCs.

Each vessel will be fitted with cryogenic tanks designed by GTT and equipped with its Mark III Flex membrane containment system.

Delivery of these vessels is scheduled from 2028 onwards.

Rate this item
(0 votes)

Related Video

Free Read