Nov 27 (LNGJ) - SNAM, the Italian natural gas grid operator and floating and onshore import terminal owner, has launched a consultation regarding the first assignment procedures for the regasification capacity at the proposed floating storage and regasification unit (FSRU) to be deployed at the port of Ravenna. The FSRU “BW Singapore” will be on station at the Adriatic port of Ravenna and be operational by the end of 2024.
“The first assignment procedures for the regasification capacity at the FSRU Ravenna Terminal have been published,’ said SNAM. “Interested parties can submit their observations on the procedure for the first assignment by 17 December 2023. As part of the consultation, interested parties may also submit expressions of interest for capacity products with a duration shorter than the assignment period by 30 November 2023,” added SNAM.








