Dutch LNG deliveries

Written by  John McKay
Tuesday, 27 June 2023
Free Read

June 27 (LNGJ)- Two LNG shipments are headed for Dutch terminals in the next week, according to shipping data. The carrier “Gaslog Gibraltar “ with 174,000 cubic metres capacity is scheduled to deliver a cargo on June 28 from the Atlantic LNG export plant at Point Fortin in Trinidad to the Eemshaven floating import terminal in Groningen. The cargo was lifted on June 17 from the Caribbean plant.

   A second delivery to the Netherlands is due on July 4 to the Gate terminal in Rotterdam by the Qatari Q-Flex vessel “Umm Slal” with 261,000 cubic metres of capacity. The shipment was loaded on June 14 at the Ras Laffan export plant in the Arabian Gulf.

Last modified on Tuesday, 27 June 2023 06:49
Rate this item
(0 votes)

Related Video

Free Read