LNG carrier movements

Written by  John McKay
Tuesday, 22 December 2015
Free Read

Dec 22 (LNGJ) - The 141,000 cubic metres capacity "LNG River Niger", operated by Bonny Gas Transport, is scheduled to deliver a cargo from Nigeria to the French Atlantic coast  import terminal at Montoir-de-Bretagne on December 23, according to shipping data. The 136,000 cubic metres capacity "Rahi" is scheduled to arrive from Qatar on December 24 at the Indian Dahej import terminal, located north of Mumbai and operated by Petronet. The 160,106 cubic metres capacity "Palu LNG" is due to unload a cargo at the Japanese port of Chiba on December 27 that was re-loaded at the Sagunto facility in southeast Spain on December 2.

Rate this item
(0 votes)

Related Video

Free Read