Wood Group Kenny (WGK) won a contract from Australia's Woodside Petroleum to provide the front-end engineering design of the flowline system and support for the proposed Greater Western Flank Phase 2 development, one of several ventures underway to help prolong the life of the North West Shelf LNG plant at Karratha.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||