US Federal Energy Regulatory Commission (FERC) has waived the mandatory pre-filing requirement for a third phase of Venture Global’s CP2 LNG expansion, signalling regulator’s openness to streamlining brownfield LNG build-outs. CP2 LNG Phase 3 is designed to boost peak liquefaction capacity from 28 mtpa to 35 mtpa.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||