First gas at BW Opal FPSO puts Santos on track with Darwin LNG

Tuesday, 23 September 2025

First gas received at Santos’ BW Opal floating production storage and offloading (FPSO) vessel puts the Australian major on track with the Darwin LNG project, CEO Kevin Gallagher said. Situated off Darwin, Northern Territories, the FSPO receives gas from the Barossa gas wells.


Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial
 
 
Last modified on Tuesday, 23 September 2025 08:49
Rate this item
(0 votes)