April 13 (LNGJ) - The 147,200 cubic metres capacity vessel “Arctic Princess” is scheduled to unload a cargo on April 13 at the Lithuania import facility at the Baltic port of Klaipeda from the Atlantic LNG plant at Point Fortin in Trinidad, according to shipping data. The 75,000 cubic metres capacity “Cheikh Bouamama” will deliver a shipment on April 14 to the Huelva import terminal in southwest Spain from the Skikda plant in Algeria, operated by Sonatrach. The 216,200 cubic metres capacity Q-Flex vessel “Al Sahla” is scheduled to unload a shipment from Qatar on April 15 at the Indian import terminal at Dahej, located near Mumbai and owned by Petronet. The 172,000 cubic metres capacity “Beidou Star” will deliver a shipment on April 21 to the Chinese Dalian import terminal, owned by PetroChina, from the Chevron-operated Gorgon plant on Barrow Island in Western Australia. The 174,100 cubic metres capacity vessel “Cesi Gladstone” will unload a shipment on April 23 at the Chinese Qingdao import terminal, owned by Sinopec, from the Australia Pacific plant in Queensland.








