Aug 31 (LNGJ) - The 165,000 cubic metres capacity vessel “Gaslog Salem” is delivering a cargo on September 1 to the Manzanillo LNG import terminal on the Pacific coast of Mexico after traversing the Panama Canal. The ship earlier crossed the Atlantic with the cargo loaded on August 16 at the Algerian export plant at Arzew on the Mediterranean coast, according to shipping data.








