Sept 12 (LNGJ) - The 165,500 cubic metres capacity carrier "Woodside Donaldson" has left the Western Australian LNG loading terminal at Dampier with a cargo for the Osaka Gas import facility at Himeji in Japan to be unloaded on September 17, according to shipping data.








