March 29 (LNGJ) - The 145,950 cubic metres capacity LNG carrier "Golar Maria" is scheduled to load a cargo on April 4 at Zeebrugge LNG terminal in Belgium for re-export to Brazil, port authorities said. Brazil has two floating dock-side import facilities at Pecem and Guanabara.








