June 20 (LNGJ) - Two LNG cargoes were headed for Germany and Belgium in the days ahead. The “Marvel Kite” carrier with 174,000 cubic metres capacity was scheduled to deliver a US cargo on June 23 to the German import terminal at the North Sea port of Wilhelmshaven. The cargo was lifted on June 9 from the Freeport plant in Texas.
The “Methane Jane Elizabeth” with 145,000 cubic metres capacity was due to discharge a Qatari cargo on June 25 at the Zeebrugge terminal in Belgium. The cargo was loaded on June 4 at Ras Laffan.








