March 7 (LNGJ) - The 180,000 cubic metre capacity LNG carrier “Gaslog Westminster” is scheduled to arrive in the UK on March 13 with a shipment to discharge at the South Hook terminal at Milford Haven, the port authorities said. The cargo was lifted on February 27 from the Sabine Pass plant in Louisiana owned by Cheniere Energy.
In another European berthing, the laden and Cyprus-flagged 172,000 cubic metres capacity carrier “Boris Davydov” arrived on March 7 at the French LNG terminal at the Channel port of Dunkirk, according to shipping data. The vessel lifted a cargo on February 28 from the Yamal plant located at Sabetta in northern Siberia in Russia.








