AES’ integrated LNG-to-power project at the entrance of the Panama Canal is set to come onstream in 2018. The French multinational Engie just signed a 10-year LNG supply accord with the US-headquartered AES, covering the entire fuel needs of the latter’s 350 MW combined-cycle power plant.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||