FERC waives pre-filing for CP2 LNG Phase 3 expansion

Thursday, 07 May 2026

US Federal Energy Regulatory Commission (FERC) has waived the mandatory pre-filing requirement for a third phase of Venture Global’s CP2 LNG expansion, signalling regulator’s openness to streamlining brownfield LNG build-outs. CP2 LNG Phase 3 is designed to boost peak liquefaction capacity from 28 mtpa to 35 mtpa.


Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial