US LNG developer Tellurian has ended 2021 with more than $300 million in liquidity and over $360 million in discounted future net cash flows of proved gas reserves in Haynesville Shale. Most of these funds will be used to finance construction of the $16.8 billion Driftwood LNG, scheduled to start in April.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||