French firm GTT signs storage contract for concrete structures that will form Arctic LNG II

Friday, 27 September 2019

Gaztransport and Technigaz (GGT), the French LNG containment tank system designer, has signed a contract to provide storage for three gravity-based structures that will form the liquefaction and export operations of the Arctic LNG II project proposed by Novatek of Russia for the Gydan Peninsula.


Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial
 
 
Last modified on Friday, 27 September 2019 08:00
Rate this item
(0 votes)