Japan’s leading utility JERA has shipped the first LNG cargo from Australia’s Barossa gas project, with processed loaded from the revamped Darwin LNG export plant in the Northern Territory. JERA holds a 12.5 percent stake in the project and is eligible to offtake approximately 425,000 tonnes of LNG annually, in line with its equity share.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||