Colombian LNG terminal operates at full capacity to support power grid as ‘El Niño’ affects hydro-electric system

Friday, 12 April 2024

The floating LNG import terminal operating company in the South American nation of Colombia said LNG deliveries reached record levels to respond to the increase in demand for gas-fired power as drought conditions caused by the “El Niño” phenomenon reduced hydro-electric supplies.


Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial
 
 
Last modified on Friday, 12 April 2024 07:57
Rate this item
(0 votes)