South Korean utility GS Energy and the construction firm BS Hanyang have been awarded a 1.1 trillion won ($815 million) project finance loan to develop the Northeast Asia LNG hub terminal in Yeosu. Built at a total cost of 1.4 trillion won, the project involves three LNG storage tanks with the first two slated to start operations by the end of 2027, and the third by the end of 2028.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||