Free Read

A German onshore LNG import terminal project has formally started construction using Spanish regasification terminal expertise at Stade, on the Elbe Estuary between Hamburg and Cuxhaven.

The project called the Hanseatic Energy Hub has just held a ground-breaking ceremony at the site of the project and attended by executives of the venture and politicians

Enagás, the Spanish LNG terminal owner, is backing the Stade LNG terminal along with the Hamburg-based terminals and storage company, the Buss Group GmbH along with the main customer, the multinational Dow chemicals group. Another shareholder si the Partners Group infrastructure fund.

The Hanseatic Hub event speakers included the Chief Minister of the German state of Lower Saxony, Stefan Weil, and Jozef Síkela, the Minister of Industry and Trade of the Czech Republic, a member of the 27-nation European Union that will hold regasification capacity at the German facility.

“Following the first floating LNG terminal, Germany’s first land-based liquefied natural gas terminal is now also being built in Lower Saxony,” said Weil in reference to the Wilhelmshaven floating terminal on the state’s North Sea Coast.

Federal role

“Our federal state is playing a key role in the expansion of infrastructure to import energy,” said Lower Saxony Minister Weil.

The statement continued that besides the two German energy and utility companies, EnBW and SEFE GmbH, which have respectively booked annual capacities of 6 billion cubic metres and 4 Bcm at the Stade terminal, so has the Czech energy company ČEZ, which has secured long-term import rights for 2 Bcm per annum.

Czech Minister Síkela said his country was looking forward to receiving its own LNG supplies via the Stade onshore terminal.

“We are constantly working to ensure the best possible future for our energy industry in the Czech Republic,” Síkela explained.

“Capacities for importing LNG from overseas are also an essential part of all this. After securing capacity in the floating LNG terminal in the Netherlands, we also managed last autumn in cooperation with ČEZ to secure capacity in the first German land-based terminal, Stade,” he added.

Czech energy security

“In three years it will contribute to covering up to a third of today's Czech consumption. Thanks to the convenient location, the terminal can also contribute to the reduction of fees for transporting gas to the Czech Republic,” Síkela stated.

Jan Themlitz, Chief Executive of the Hanseatic Hub project at Stade said that “after six years of planning and permitting”, the construction phase has now started.

“Privately initiated and funded we are benefiting from the vast experience of our shareholders. Partners Group is one of the largest private investors in the infrastructure sector and Enagás, Europe’s leading LNG-terminal operator, will be assuming operational responsibility and is teaming up with Dow, the ideal industrial partner on the site in Stade,” said Themlitz.

“As an initiator, the Buss Group has also played a key role in driving the project forward and bringing the shareholder-team together,” the CEO added.

Spanish role

Técnicas Reunidas, the Madrid-based engineering company, will provide Spanish expertise in leading the construction consortium for the terminal with completion set for 2027.

A Spaniard, Alejandro Marjalizo, has additionally been appointed as the Chief Technical and Operations Officer of the project and is a member of the Hansiatic Hub Management Board, reporting directly to CEO Themlitz.

Marjalizo previously worked at Enagás as an electrical engineer in 2007 and has focused on LNG since 2011.

Over the past 13 years, he has worked as a project engineer and as a project manager at LNG terminals in multiple locations, including at the Spanish terminals at Huelva, Cartagena and Barcelona as well as Altamira in Mexico.

Germany is also building a second onshore LNG terminal at Brunsbüttel in the state of Schleswig-Holstein, north of Hamburg, and where existing floating regasification services are currently operating.

Published in Latest News
Monday, 22 November 2021 09:35

UAE gas contract

Free Read

Nov 22 (LNGJ) - Técnicas Reunidas, the Spanish engineering company, and a local partner in the United Arab Emirates were awarded a $950 million contract in Abu Dhabi for the world’s largest offshore sour natural gas development in the Ghasha concession.

   The award was made by Abu Dhabi National Oil Company and the work scope covers several fields with production capacity of around 340 million standard cubic feet per day by 2025. The offshore gas fields are located 190 kilometres northwest of the emirate of Abu Dhabi.

Published in News in brief
Wednesday, 01 July 2020 08:05

Algeria gas hand-over

Free Read

July 1 (LNGJ) - Sonatrach, the Algerian state energy company and operator of two LNG export plants on the North African coast, signed its acceptance of the Touat gas project in southwest Algeria being passed to Groupement Touat Gaz (GTG), a joint venture between Sonatrach and Neptune Energy of the UK.

Operation of the facility had previously been in the hands of the project contractor, Spain’s Técnicas Reunidas, since the first gas was sent into the Algerian domestic gas pipeline network in September 2019. The Touat facility is located around 1,400 kilometres southwest of Algiers in the Sahara Desert and comprises 19 natural gas development wells, a gas treatment plant for gas and stabilised condensate with a gathering network with pipelines.

Published in News in brief

Qatar Petroleum and German utility Uniper are in firm talks on the supply of LNG by Qatargas to the proposed import terminal at the North Sea port of Wilhemshaven in the state of Lower Saxony.

Published in Latest News