Feb 27 (LNGJ) - The Norwegian-flagged LNG carrier “Ribera Duero Knutsen” with 173,400 cubic metres capacity was scheduled to berth on February 27 at the UK Isle of Grain import terminal on the Medway River in Kent with a cargo from the US. The shipment was loaded on February 15 at the Corpus Christi export plant in Texas operated by Cheniere Energy.
Two further deliveries are scheduled for the UK on March 3 at the import terminals at the Welsh port of Milford Haven. The “LNG Prosperity” with 174,000 cubic metres capacity is due to discharge a cargo from Peru at the Dragon terminal. That cargo was lifted on February 2 from the Pampa Melchorita facility on the Pacific Coast of Peru. Also on March 3, the 173,400 cubic metres capacity vessel “Woodside Rees Withers” is due at the South Hook terminal with a shipment from the US Corpus Christi plant.
May 16 (LNGJ) – At least three LNG cargoes were being unloaded at Spanish ports this week. The 167,400 cubic metres capacity carrier “Methane Mickie Harper” was discharging a cargo from Peru on May 16 at the Bilbao terminal, according to shipping data. The 173,400 cubic metres capacity vessel “Ribera Duero Knutsen” was also scheduled to berth at Bilbao with a cargo from the US Sabine Pass plant in Louisiana and a third vessel, the 174,000 cubic metres capacity carrier “British Sponsor”, was heading for either Cartagena or Barcelona with a shipment from the US Cove Point plant in Maryland.