Jan 17 (LNG) – Three LNG cargoes are heading for the UK Isle of Grain import terminal at the end of January from the US Gulf Coast as prices at the UK National Balancing Point dropped to a 17-month low of $16.70 per million British thermal units, a level last seen on September 2, 2021. The “BW Pavilion Aranda” with capacity of 173,400 cubic metres is scheduled to deliver a cargo on January 28 from the Cameron LNG plant in Louisiana and that was lifted on January 15, according to shipping data. Two other cargoes are being delivered from the Sabine Pass plant in Louisiana.
The 173,600 cubic metres capacity “Stena Crystal Sky” is scheduled to berth on January 29 at the Medway River terminal to discharge its Louisiana shipment and the third cargo heading for the Kent terminal is scheduled to arrive on January 31 onboard the “Ribero Duero Knutsen” with 173,400 cubic metres of capacity.