March 25 (LNGJ) - The first April LNG cargo for the UK will come from Trinidad and Tobago in the Caribbean, according to port authorities. The 173,400 cubic metres capacity carrier “Minerva Psara” lifted the cargo from the Point Fortin liquefaction plant in Trinidad on March 20 and the shipment is scheduled to be discharged on April 1 at the UK South Hook import terminal in Milford Haven.
Dec 15 (LNG) – The UK is scheduled to receive two LNG shipments from Peru next week. The 173,400 cubic metres capacity “Valencia Knutsen” lifted a cargo on November 21 from the Pampa Melchorita plant on the Pacific Coast of Peru and will head for the UK Dragon terminal at Milford Haven from an anchorage near Tenerife in Spain. The shipment, which was originally destined for the Dutch Gate terminal in Rotterdam, is scheduled to be discharged at the UK facility on December 20.
A second shipment from Peru was lifted on November 26 and is expected to arrive at the Dragon facility on December 21 on board the 173,4000 cubic metres capacity “Minerva Psara”, according to the Milford Haven port authority.