Nov 28 (LNG) – Two December cargoes are heading for the UK. The “BW Pavilion Aranda” with 173,400 cubic metres capacity is scheduled to discharge a shipment on December 2 at the South Hook terminal at the Port of Milford Haven in Wales. The cargo was loaded on November 16 at the Freeport facility in Texas, according to shipping data. The “Iberica Knutsen” with 135,230 cubic metres capacity will deliver a cargo on the same date to the Isle of Grain LNG terminal in Kent, southeast of London. The cargo was lifted on November 11 from the Corpus Christi plant in Texas.
Dec 26 (LNGJ) - As the US LNG export plant build-out continues and the volumes of shipments grow, the UK Port of Milford Haven in Wales is scheduled to receive three shipments from the Gulf Coast in the next five days.
The 155,000 cubic metres capacity vessel “Gaslog Savannah” is scheduled to deliver a cargo on December 29 from the Cameron export facility on the shore of the Calcasieu Ship Channel in Louisiana to the UK South Hook terminal, according to port authorities.
Then on December 31, the 138,000 cubic metres capacity carrier “Iberica Knutsen” will unload a shipment from Cheniere Energy’s Sabine Pass plant in Louisiana at the Welsh port’s Dragon regasification terminal. The third cargo also comes from Sabine Pass and will be delivered by the 174,000 cubic metres capacity carrier “Flex Rainbow” on the last day of 2019 to the South Hook terminal.