Poland’s state-controlled TSO Gaz-System is considering adding a second floating storage and regasification unit (FSRU) to its planned LNG import terminal in Gdansk. The project is slated to start with 6.1 bcm per year of regas capacity and could be expanded by another 4.5 bcm to 10.6 bcm per year when it comes online, currently targeted for 2028.