Oct 2 (LNGJ) – Cargoes from Algeria and Peru are heading for the UK in the days ahead. The “Berge Arzew” with 138,100 cubic metres of capacity is due to unload a cargo on October 3 at the Isle of Grain terminal on the Medway River in Kent, according to shipping data. The cargo was loaded on September 22 at Algeria’s Arzew export plant.
The LNG carrier “Methane Julia Louise” with 167,400 cubic metres of capacity is scheduled to deliver a cargo on October 6 to the UK Dragon import terminal at the port of Milford Haven. The cargo was lifted on August 28 from the Pampa Melchorita plant on the Pacific Coast of Peru.
Sept 4 (LNG) – Three cargoes are heading for Northwest European LNG import terminals in the days ahead. The “Berge Arzew” with 138,100 of capacity is due to deliver a cargo from Algeria on September 6 to the UK Isle of Grain terminal on the Medway River in Kent, according to shipping data. The cargo was lifted on August 29 from the Algerian plant at Arzew.
The carrier “BW Lilac” with 174,300 cubic metres capacity is scheduled to discharge a US cargo on September 6 at the Dutch Gate terminal in Rotterdam. The cargo was lifted on August 24 from the Calcasieu Pass plant in Louisiana. Belgium will receive a shipment from Qatar on September 7 at the Zeebrugge terminal onboard the “Al Marrouna” with 149,540 cubic metres capacity. The cargo was loaded on August 20 at the Ras Laffan plant in the Arabian Gulf.
May 4 (LNGJ) - Three cargoes are heading for Belgium, the Netherlands and the UK and are expected to berth in the next couple of days with cargoes from Russia, Algeria and the US respectively, according to shipping data.
The LNG carrier “Vladimir Vize” with 172,600 cubic metres of capacity is scheduled to berth on May 5 at the Zeebrugge terminal in Belgium with a shipment from the Yamal plant in Siberia lifted on April 28. The “Berge Arzew” with 135,000 cubic metres capacity was scheduled to arrive on May 6 at the UK Isle of Grain terminal in Kent with a shipment from Algeria. The 135,425 cubic metres capacity vessel “Seapeak Catalunya” will discharge a cargo on May 5 at the Dutch Gate terminal in Rotterdam and lifted on April 22 from the Sabine Pass plant in Louisiana.
May 31 (LNGJ) - The 138,100 cubic metres capacity carrier, the “Berge Arzew” is scheduled to deliver an Algerian cargo on May 31 to the Isle of Grain LNG import terminal, operated by National Grid Plc on the estuary 45 miles southeast of London. The shipment, lifted on May 25 from the Arzew plant on the Mediterranean coast of Algeria, is arriving in the UK as the National Balancing Point (NBP) gas price was firm at the equivalent of $8.60 per million British thermal units.