Engineering contracts lined up for Australian Barossa gas field to extend Darwin LNG lifespan

Monday, 18 June 2018

Asia-Pacific LNG stakeholder Santos said it made further progress on the front-end engineering and design phase of the Barossa offshore project with the award of three major engineering contracts to continue supplying feed-gas to the Darwin LNG plant, operated by partner ConocoPhillips since 2006.


Subscriber content
 

This content is available only to subscribers
please log in below or subscribe now / request a free trial
 
 
Last modified on Monday, 18 June 2018 06:37
Rate this item
(0 votes)