Asia-Pacific LNG stakeholder Santos said it made further progress on the front-end engineering and design phase of the Barossa offshore project with the award of three major engineering contracts to continue supplying feed-gas to the Darwin LNG plant, operated by partner ConocoPhillips since 2006.
| Subscriber content | ||
![]() This content is available only to subscribers please log in below or subscribe now / request a free trial |
||
|
|
||